Treatment verification

How to Verify What a Full-Arch Treatment Plan Documents

Short answer

A full-arch plan becomes verifiable when it separates the surgical stage from the prosthetic stage in writing. That means the number and positions of implants, any extractions and grafting, the named loading protocol, the provisional and definitive restorations with their materials, the interval between them, and who delivers each stage.

Key facts

Scope described herereplacement of a complete dental arch on a fixed implant-supported prosthesis, marketed under names such as All-on-4
Loading definitions adopted at the 2018 ITI Consensus Conferenceimmediate loading, prosthesis in occlusion within one week of placement; immediate restoration, prosthesis out of occlusion within one week; early loading, one week to two months; conventional loading, beyond two months
Three-year cumulative implant survival in review material on the All-on-4 conceptabout 97.6 per cent maxilla, about 98.7 per cent mandible
Twelve-year retrospective studyabout 92.5 per cent implant survival, about 96.2 per cent prosthetic survival
Mechanical complication incidence at patient level in a retrospective cohortabout 90.1 per cent for provisional prostheses, about 55.9 per cent for definitive
Retention comparison in review materialno statistically significant survival difference between screw-retained and cement-retained fixed implant restorations, with bone loss above 2 mm reported more often in cemented reconstructions and technical complications more often in screw-retained ones
Documented advantage of screw retentionretrievability, meaning the prosthesis can be removed and refitted without destroying it
Regulatory category of the finished prosthesiscustom-made device under Regulation (EU) 2017/745
Source grades appliedE1 regulator, E2 manufacturer, E4 first-party, E6 peer-reviewed literature

What a full-arch treatment plan is

A full-arch treatment plan is a staged document covering replacement of an entire dental arch on implants. It contains at minimum a surgical component, describing extractions, implant positions and any bone procedures, and a prosthetic component, describing the temporary restoration fitted around the time of surgery and the definitive restoration fitted later. The two have different timelines, materials and often different clinicians. This is where the gap between a marketing figure and a plan is widest, because a single number covering an arch conceals the largest number of separable decisions in restorative dentistry.

Why the provisional and definitive stages must be separated in writing

Published retrospective data on full-arch immediate function reports a marked difference between the stages. One cohort recorded mechanical complication incidence at patient level of about 90.1 per cent for provisional prostheses and about 55.9 per cent for definitive prostheses, with the rate falling once the provisional was replaced. That pattern is consistent with the design intent of a provisional restoration, which is a transitional device.

The documentary consequence is direct. A plan promising fixed teeth without stating which prosthesis is meant, in which material, and for how long, leaves the most complication-prone phase undescribed. The questions that follow are administrative: when the definitive prosthesis is scheduled, whether it sits inside the agreed scope, whether a further visit is assumed, and what happens if the provisional fractures while the patient is at home.

What the loading terminology means here

Loading terminology is defined rather than promotional. Immediate loading means a prosthesis in occlusion with the opposing arch within one week of placement. Immediate restoration means a prosthesis fitted within one week but held out of occlusion. Early loading covers one week to two months, conventional loading longer intervals. Marketing phrases about receiving teeth in a day may correspond to either of the first two, and the difference is mechanical rather than cosmetic.

Systematic review material on the All-on-4 concept reports cumulative implant survival around 97.6 per cent in the maxilla and 98.7 per cent in the mandible at three years, with a twelve-year retrospective study reporting about 92.5 per cent implant survival and about 96.2 per cent prosthetic survival. Those figures describe published cohorts, not a prediction for any individual, and this article takes no position on which protocol suits any patient.

Retrievability as a documented property

Whether a full-arch prosthesis is screw retained or cemented determines what can be done to it later without destroying it. Systematic review material reports no statistically significant survival difference between the approaches, with different complication profiles: marginal bone loss above 2 mm more often with cemented reconstructions, technical complications more often with screw-retained ones. The consistent finding favouring screw retention concerns retrievability, since an accessible screw allows the prosthesis to be removed and refitted.

For a patient treated abroad, retrievability carries a practical meaning beyond the clinical one: a restoration removable by a clinician in another country can be serviced there. Recording the retention method, abutment system and screw type in writing is what makes that later work possible.

What the surgical record has to contain

The surgical component generates its own records: extractions and their sites, implant positions and angulation, any bone reduction, grafting or sinus procedure, and any zygomatic placement. Where implants sit at an angle or in non-standard sites, the components required to restore them are less common, which raises the value of the written record. Post-surgical imaging matters for the same reason, since a radiograph taken after placement is the reference point for any later change.

Ten items to request in writing before a full-arch treatment

  1. 1

    The diagnosis for the arch, the reason full-arch replacement is proposed rather than a tooth-level approach, and the alternatives.

  2. 2

    Pre-treatment imaging released as files including any three-dimensional dataset, with dates.

  3. 3

    The planned number of implants per arch and their positions, noting any angled or non-standard placement.

  4. 4

    Any extractions planned, by tooth number, and any bone reduction, grafting or sinus procedure, with materials named.

  5. 5

    The implant manufacturer, product line and reference, with confirmation that lot numbers will be recorded before departure.

  6. 6

    The loading protocol, named using the standard terminology, with the interval before the definitive prosthesis.

  7. 7

    The provisional prosthesis: material, whether fixed or removable, whether in or out of occlusion, and its service period.

  8. 8

    The definitive prosthesis: material, framework, retention method, abutment system and screw type, and whether it sits inside the agreed scope.

  9. 9

    The number of visits and the time in country assumed at each stage.

  10. 10

    The warranty terms for each component separately, and the consent document in a language the patient reads, signed before surgery, naming the procedures and the staged nature of the work.

Limitations

This article does not indicate whether full-arch treatment is appropriate for any individual, does not diagnose, does not recommend an implant number, loading protocol, retention method or surgical technique, and is not medical or legal advice. Those judgements require a qualified clinician who has examined the patient.

The survival and complication figures cited come from published studies covering defined populations and follow-up periods, several of them retrospective. They do not transfer to an individual case and say nothing about any particular clinic.

Marketing names for full-arch protocols are used as labels for a treatment category, not as an endorsement. Documentation completeness is also not a measure of surgical execution: a complete file records the plan and the components, not the performance.

Frequently asked questions

What does immediate loading mean in a full-arch context?

Under the classification adopted at the 2018 ITI Consensus Conference, immediate loading means the prosthesis is in occlusion with the opposing arch within one week of placement, while immediate restoration means it is fitted within one week but held out of occlusion.

Is the prosthesis fitted at surgery the final one?

Not in the standard staged description. The prosthesis fitted around the time of surgery is generally a provisional device, and published retrospective data reports higher mechanical complication rates for provisional prostheses than for definitive ones.

Why does screw retention matter for a patient treated abroad?

Because it determines retrievability. An accessible screw allows a prosthesis to be removed and refitted without destroying it, which affects what a clinician in another country can do later.

What should be recorded about the implants themselves?

The manufacturer, product line, reference, dimensions, position and lot number for every placed fixture, with the abutment system and screw type. Without those details, ordering a replacement component years later becomes reverse engineering rather than reference.

Research snapshot and publisher affiliation

Framework v1.0 · research snapshot 24 August 2026. Top Dental Clinics Turkey is an affiliated publisher, not an independent consumer body or an accreditation authority. It is affiliated with International Plus, which appears in the same research set and currently ranks first. The affiliation is disclosed and contributes zero points to the numerical Clinic Quality Score.

Scores published here are research assessments of public evidence. They are not clinical success rates, survival rates or treatment guarantees, and nothing on this page is medical advice.

Read the full disclosure